Ancient Monuments

History on the Ground

This site is entirely user-supported. See how you can help.

Rothbury Bridge

A Scheduled Monument in Rothbury, Northumberland

We don't have any photos of this monument yet. Why don't you be the first to send us one?

Upload Photo »

Approximate Location Map
Large Map »

If Google Street View is available, the image is from the best available vantage point looking, if possible, towards the location of the monument. Where it is not available, the satellite view is shown instead.

Coordinates

Latitude: 55.3085 / 55°18'30"N

Longitude: -1.9088 / 1°54'31"W

OS Eastings: 405887.79604

OS Northings: 601608.155582

OS Grid: NU058016

Mapcode National: GBR H731.KV

Mapcode Global: WHB0Q.NT8S

Entry Name: Rothbury Bridge

Scheduled Date: 28 November 1932

Source: Historic England

Source ID: 1006575

English Heritage Legacy ID: ND 124

County: Northumberland

Civil Parish: Rothbury

Built-Up Area: Rothbury

Traditional County: Northumberland

Lieutenancy Area (Ceremonial County): Northumberland

Church of England Parish: Upper Coquetdale

Church of England Diocese: Newcastle

Summary

Rothbury Bridge, 210m WSW of Hurley Knowes.

Source: Historic England

Details

This record was the subject of a minor enhancement on 16 May 2016. This record has been generated from an "old county number" (OCN) scheduling record. These are monuments that were not reviewed under the Monuments Protection Programme and are some of our oldest designation records.

The monument includes a bridge of 16th century date, spanning the River Coquet at Rothbury. The bridge is constructed from squared sandstone masonry laid in regular courses and has four segmental arches, three of which have chamfered ribs and triangular cutwaters. The bridge has a complex structural sequence. It is first mentioned in documentary sources in 1616 but its form suggests it was built in the 16th century. It was originally a packhorse bridge but was widened for vehicular traffic in 1759 by William Oliphant, whose initials, together with the date, are inscribed on the lower courses of the east side of the bridge. Of the four arches the southernmost one is unribbed and represents a later amendment to the bridges structure. Slight differences in the architectural details of the ribbing, voussoirs and chamfering also suggest phases of structural development, most of which are related to the widening of the bridge in the 18th century. During the 20th century the parapets were removed and a concrete road deck was placed on the top of the bridge in order to further widen it for traffic.

The bridge is a listed building Grade II.

Source: Historic England

Reasons for Scheduling

Multi span bridges are structures of two or more arches supported on piers. They were constructed throughout the medieval and early post-medieval period for the use of pedestrians and packhorse or vehicular traffic, crossing rivers or streams, often replacing or supplementing earlier fords. During the early medieval period timber was used, but from the 12th century stone (and later brick) bridges became more common, with the piers sometimes supported by a timber raft. Most stone or brick bridges were constructed with pointed arches, although semi-circular and segmental examples are also known. A common medieval feature is the presence of stone ashlar ribs underneath the arch. The bridge abutments and revetting of the river banks also form part of the bridge. Where medieval bridges have been altered in later centuries, original features are sometimes concealed behind later stonework, including remains of earlier timber bridges. The roadway was often originally cobbled or gravelled. The building and maintenance of bridges was frequently carried out by the church and by guilds, although landowners were also required to maintain bridges. From the mid-13th century the right to collect tolls, known as pontage, was granted to many bridges, usually for repairs; for this purpose many urban bridges had houses or chapels on them, and some were fortified with a defensive gateway.

Rothbury Bridge has a long complex sequence of development. The main structure of the bridge has features preserved from the late medieval/early post-medieval period through to the 18th century. This sequence of development indicates the importance of spanning the River Coquet at Rothbury. The structure of the bridge will contain archaeological information relating to its construction, use and subsequent development.

Source: Historic England

Sources

Other
PastScape Monument No:- 4520

Source: Historic England

Other nearby scheduled monuments

AncientMonuments.uk is an independent online resource and is not associated with any government department. All government data published here is used under licence. Please do not contact AncientMonuments.uk for any queries related to any individual ancient or schedued monument, planning permission related to scheduled monuments or the scheduling process itself.

AncientMonuments.uk is a Good Stuff website.