Ancient Monuments

History on the Ground

This site is entirely user-supported. See how you can help.

Berwick Bridge

A Scheduled Monument in Berwick-upon-Tweed, Northumberland

We don't have any photos of this monument yet. Why don't you be the first to send us one?

Upload Photo »

Approximate Location Map
Large Map »

If Google Street View is available, the image is from the best available vantage point looking, if possible, towards the location of the monument. Where it is not available, the satellite view is shown instead.

Coordinates

Latitude: 55.7678 / 55°46'4"N

Longitude: -2.0081 / 2°0'29"W

OS Eastings: 399587.510996

OS Northings: 652720.538353

OS Grid: NT995527

Mapcode National: GBR G1FR.17

Mapcode Global: WH9YK.4904

Entry Name: Berwick Bridge

Scheduled Date: 30 November 1925

Source: Historic England

Source ID: 1003654

English Heritage Legacy ID: ND 9

County: Northumberland

Civil Parish: Berwick-upon-Tweed

Built-Up Area: Berwick-upon-Tweed

Traditional County: Northumberland

Lieutenancy Area (Ceremonial County): Northumberland

Church of England Parish: Tweedmouth St Bartholomew

Church of England Diocese: Newcastle

Summary

Berwick Bridge, 90m south of the Royal Tweed Bridge.

Source: Historic England

Details

This record was the subject of a minor enhancement on 11 May 2016. This record has been generated from an "old county number" (OCN) scheduling record. These are monuments that were not reviewed under the Monuments Protection Programme and are some of our oldest designation records.

The monument includes a bridge of 17th century date, spanning the River Tweed at Berwick-upon-Tweed and linking Main Street with Bridge End. The bridge has fifteen arches with cutwaters having columns and busts. The bridge is 355m long and 5m wide. The arches increase in height at the northern end and stand up to a maximum height of 14m. The construction of the bridge, also known as the Old Bridge, commenced on 19th June 1611 and was virtually complete by 1625-1626, however, there are references to paving the bridge and finishing in the parapet in 1626-27. The bridge succeeded several former bridges, which were constructed from wood and date back to at least the 12th century.

Test pit excavation in 2001 exposed the original bridge structure surviving beneath road levelling deposits, some of which are themselves pre-20th century. The bridge is a Grade I listed building and is currently in use as a road bridge.

Source: Historic England

Reasons for Scheduling

Multi span bridges are structures of two or more arches supported on piers. They were constructed throughout the medieval and early post-medieval period for the use of pedestrians and packhorse or vehicular traffic, crossing rivers or streams, often replacing or supplementing earlier fords. During the early medieval period timber was used, but from the 12th century stone (and later brick) bridges became more common, with the piers sometimes supported by a timber raft. The bridge abutments and revetting of the river banks also form part of the bridge. The roadway was often originally cobbled or gravelled.

Berwick Bridge survives in excellent condition and is regarded as one of the finest bridges in England. Beneath the current road surface archaeological evidence of the bridges original surface will survive. The rest of the structure of the bridge survives in good condition and will contain evidence on the original construction and consequent maintenance of the bridge.

Source: Historic England

Sources

Other
PastScape Monument No:- 4183

Source: Historic England

Other nearby scheduled monuments

AncientMonuments.uk is an independent online resource and is not associated with any government department. All government data published here is used under licence. Please do not contact AncientMonuments.uk for any queries related to any individual ancient or schedued monument, planning permission related to scheduled monuments or the scheduling process itself.

AncientMonuments.uk is a Good Stuff website.